EV Charging Cable Extension Cord EVDC-RS90S90
Key Advantages
- High flexibility with excellent bending capability
- Oil resistant construction
- UV resistant for outdoor applications
- High flame resistance rating
- Moisture-proof design
Application Range
- Connection wire between EV AC charging equipment
- EV AC Charging stations and charging piles
Cable Construction
Conductor: Stranded, tinned or bare copper
Insulation: Thermoplastic Elastomer
Assembly: 10~70(2~5 cores) + 0.5~0.75P (1~10 cores)
Wrap: Non-woven material
Sheath: TPE (Thermoplastic Elastomer)
Compliance Standards
CQC1103~1105-2015
RoHS and REACH Compliant
Technical Specifications
| Parameter |
Specification |
| Rated Voltage |
450/750V AC |
| Temperature Range |
-40ºC to 90ºC |
| Flame Rating |
IEC60332-1-3, FT1, FT2 |
| Voltage Withstand Test (Power Wire) |
1.0~70mm²: DC 2.5kV/15min |
| Voltage Withstand Test (Signal Wire) |
0.5~0.75mm²P: DC 1.5kV/15min |
Company Profile
Founded in 2004 with 9 million USD capital investment, our headquarters factory in Kunshan covers 14,980 square meters. In 2020, we established our Nantong facility with 100 million RMB capital investment covering 34,000 square meters.
With ISO9001, ISO14001, IATF16949, and ISO13485 system certifications, all our products have passed CCC, UL, CUL, CE, CSA, and ETL safety certifications. We serve global customers across various industries through our established sales system, guided by our management principles of HONESTY, INNOVATION, and ENVIRONMENTAL PROTECTION.
Certifications
Production Process
Shipping & Logistics
Frequently Asked Questions
What products do you supply?
We manufacture consumer electronics wires, hook-up wires, industrial cables, robot cables, EV charging cables, and new/green energy cables.
What certifications do you hold?
We maintain UL, CE, 3C, Dekra, CQC, TUV, RoHS, Reach, and ETL certifications.
Can we receive samples before ordering?
Yes, we provide samples for evaluation prior to order placement.
What is your typical lead time?
Standard orders are completed in 2-3 weeks, with 5-6 weeks during peak seasons.
How do you guarantee product quality?
We conduct pre-production sampling and final inspection before shipment to ensure quality standards.
Major Customers